May 06, 2026 PASS SAP E_S4CON_2505 EXAM WITH UPDATED DUMPS [Q12-Q31]

Share

May 06, 2026 PASS SAP E_S4CON_2505 EXAM WITH UPDATED DUMPS

E_S4CON_2505 Questions PDF [2026] Use Valid New dump to Clear Exam

NEW QUESTION # 12
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question.

  • A. PARDIST_SHD
  • B. TABIM_SHADOW_INC
  • C. PARMVNT_UPG
  • D. TABIM UPG

Answer: C,D


NEW QUESTION # 13
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question.

  • A. You can verify that the content of the download directory matches the stack XMML file.
  • B. You can record the modification adjustment during migration and use the transports in the next runs.
  • C. You can find the optimal number of parallel R3load processes by monitoring host performance.
  • D. You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs.

Answer: C,D


NEW QUESTION # 14
You want to perform an SAP S/4HANA conversion using SUM with in place DMO.
Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? Note: There are 3 correct answers to this question.

  • A. Import of dictionary objects from the download directory in phase DDIC_UPG
  • B. Generation of the new ABAAP loads in phase RUN_SGEN_GENERB
  • C. Creation of application tables in the SAP HANA database in phase
  • D. Activation of dictionary objects in phase ACT_UPG
  • E. Import of upgrade and language data from the download directory in phase TAABIM UPG

Answer: A,D,E


NEW QUESTION # 15
Which orchestration tool facilitates a move to SAP cloud by wrapping different scenarios such as Lift&Shift or system conversion to SAP S/4HANA?

  • A. SAP migration cockpit
  • B. SAP Business Transformation Center
  • C. RISE with SAP system transition workbench
  • D. Software Orchestrator

Answer: C


NEW QUESTION # 16
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functions are switched on. Following SAP recommendations, how will you achieve this? Note: There are 2 correct answers to this question.

  • A. Import a transport request from the development system that contains the recording of the activation.
  • B. During conversion, SUM delivers some business functions already activated.
  • C. Activate the required business functions manually in the production system.
  • D. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.

Answer: A,B


NEW QUESTION # 17
You performed a custom code check for an SAP S/4HANA conversion.
In which transactions can you review the results? Note: There are 2 correct answers to this question.

  • A. SAT(Runtime Analysis)
  • B. SYCM (Simplification Database Content)
  • C. ATC (ABAP Test Cockpit)
  • D. SE80 (Object Navigator)

Answer: C,D


NEW QUESTION # 18
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

  • A. EU IMPORT ALL
  • B. EU_CLONE MIG_DT_CREATTE
  • C. EU_CLONE MIG SOT RUN
  • D. EU CLONE MIG_DT_RUN

Answer: D


NEW QUESTION # 19
Which preoperational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.
  • B. Delete client 066 (Early-Watch client).
  • C. Install add-on SAP Gateway 7.50.
  • D. Perform the custom code adjustment.

Answer: A,B


NEW QUESTION # 20
What is the benefit of using the UPGANAXML file from a previous SUM run?

  • A. To repeat specific phases during the SUM run
  • B. To auto-fill specific fields on selected screens on the SUM UI
  • C. To make the progress information within SUM UI more accurate
  • D. To skip selected phases during the SUM run

Answer: C


NEW QUESTION # 21
You are performing an SAP S/4HANA conversion.
When does the silent data migration (SDM) take place using the SUM defaults?

  • A. During the Post processing roadmap step
  • B. Before the start of the SUM technical downtime
  • C. After SUM has ended
  • D. During the Preprocessing roadmap step

Answer: C


NEW QUESTION # 22
You are performing an SAP S/4HANA conversion of the development system.
Which credentials do you use, and in which system, to perform the adjustment of dictionary objects (SPDD)?

  • A. Credentials of a named user in client 000 of the shadow system
  • B. Credentials of user DDIC in client 000 of the shadow system
  • C. Credentials of user DDIC in the development client of the development system
  • D. Credentials of a named user in the development client of the development system

Answer: D


NEW QUESTION # 23
SUM was registered at the SAP Host Agent.
Where does the SAP Host Agent find the path to the SUM directory?

  • A. The path was stored in file sumabap.conf during registration.
  • B. The path was stored in file host profile during registration.
  • C. The path is taken from the URL entered in the browser to start SUM.
  • D. The path was stored to the environment of user <sid>adm during registration.

Answer: A


NEW QUESTION # 24
When using the DMO of SUM, which files can be handled by SUM in the download directory? Note:
There are 2 correct answers to this question.

  • A. Stack XML file calculated by the maintenance planner
  • B. Breakpoint configuration file SAPUPPHAS.BRK
  • C. MIGRATE_DT_DUR.XML file from a previous run
  • D. Parameter file SAPup_add.par

Answer: A,C


NEW QUESTION # 25
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for thee last time?

  • A. At the end of the downtime
  • B. As part of the cleanup process
  • C. Early in the downtime
  • D. Before the downtime starts

Answer: D


NEW QUESTION # 26
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A.
  • B.
  • C.
  • D.
  • E.

Answer: A,B,D


NEW QUESTION # 27
You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this question.

  • A. In Process Control Center
  • B. In DMO Migration Preparation
  • C. In SUM Parameters
  • D. In SUM Analysis

Answer: A,C


NEW QUESTION # 28
......

E_S4CON_2505 Study Guide Brilliant E_S4CON_2505 Exam Dumps PDF: https://troytec.getvalidtest.com/E_S4CON_2505-brain-dumps.html