Verified C-P2W43-2023 exam dumps Q&As with Correct 82 Questions and Answers [Q35-Q60]

Share

Verified C-P2W43-2023 exam dumps Q&As with Correct 82 Questions and Answers

SAP C-P2W43-2023 Test Engine PDF - All Free Dumps from GetValidTest

NEW QUESTION # 35
Which objects can you assign to a Maintenance Service Order Item? Note: There are 2 correct answers to this question.

  • A. Service Master Record
  • B. Service Product
  • C. Service Work Center
  • D. DIP Profile

Answer: B,D


NEW QUESTION # 36
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?

  • A. Scheduling type
  • B. Package offset
  • C. Initial/subsequent buffer
  • D. Call horizon

Answer: C


NEW QUESTION # 37
You want to display vehicle-specific data for a piece of equipment. How do you proceed?

  • A. Assign a view profile to the combination of equipment category and vehicle class.
  • B. Assign a view profile to the combination of vehicle type and equipment category.
  • C. Set the relevant flags in Customizing activity "Define Additional Business Views for Equipment Categories".
  • D. Assign a view profile to an equipment category for fleet equipment.

Answer: B


NEW QUESTION # 38
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question

  • A. Assign an Inspection Type to a Maintenance Order Type.
  • B. Create a control key which expects inspection characteristic assignments
  • C. Maintain settings at plant level for usage decisions.
  • D. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant

Answer: A,C


NEW QUESTION # 39
What do you need to configure to enable entries in the action log of a piece of equipment?

  • A. Define the corresponding history related field for the equipment reference category.
  • B. Activate the change documents for the equipment category.
  • C. Define history related fields in the usage period customizing.
  • D. Activate the change documents for the equipment reference category.

Answer: B,C


NEW QUESTION # 40
Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question

  • A. Classification data assigned to a technical object
  • B. QM inspection plan with assigned inspection characteristics
  • C. Master inspection characteristics assigned to PM task list operations
  • D. Inspection point type assigned to the task list header

Answer: C,D


NEW QUESTION # 41
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question

  • A. Via activity type and hourly rate
  • B. Via organizational unit and personal hourly rate
  • C. Via cost center assigned to a personnel number
  • D. Via cost center and activity type

Answer: A,D


NEW QUESTION # 42
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question

  • A. In the report Material: Where-Used List
  • B. In the list editing (single-level) for maintenance orders
  • C. Within a maintenance order
  • D. In the material reservation list in inventory management

Answer: A,C


NEW QUESTION # 43
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

  • A. Technical completion date of the maintenance order
  • B. The date of the final confirmation
  • C. Actual finish date of the maintenance order
  • D. Planned date of the next call, independent of maintenance order dates

Answer: A


NEW QUESTION # 44
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time-key date. The orders should be called 3 months before the planned date.How can you set up the maintenance plan? Note: There are 2 correct answers to this question

  • A. Set the call horizon to 90 days.
  • B. Set the call horizon to 25%.
  • C. Set the offset to 3 months
  • D. Set the call horizon to 75%

Answer: B,C


NEW QUESTION # 45
How can you assign a material BOM to a piece of equipment?

  • A. Via field model number in the equipment master
  • B. Via material BOM header in the serialization data
  • C. Via creation of an equipment BOM
  • D. Via field construction type

Answer: D


NEW QUESTION # 46
What are characteristics of the structure indicator? Note: There are 2 correct answers to this question

  • A. It restricts the number of hierarchical levels to no more than 6
  • B. It sets the hierarchy levels of the functional location structure.
  • C. It defines the allowed characters for a functional location
  • D. It limits the types of characters in the edit mask to Alpha and Numeric.

Answer: B,D


NEW QUESTION # 47
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question?

  • A. Analyze overdue maintenance orders that have NOT been finally confirmed
  • B. Analyze confirmed maintenance orders that have NOT been settled.
  • C. Analyze maintenance orders that are still in planning and have NOT been released.
  • D. Display approved purchase requisitions for which purchase orders have been generated.
  • E. Display approved purchase requisitions for which NO purchase orders have been generated

Answer: A,D,E


NEW QUESTION # 48
You want to create a maintenance order with an external order operation that includes service items.
How can you achieve this? Note: There are 2 correct answers to this question

  • A. The assignment of a control key with the service indicator set is mandatory
  • B. The usage of a model service specification is mandatory.
  • C. The assignment of a control key with key externally processed operation is sufficient.
  • D. The actual value entry can be recorded only via the service entry sheet

Answer: A,B


NEW QUESTION # 49
Which default object type do you use to settle a refurbishment order?

  • A. The WBS element
  • B. The fixed asset
  • C. The material
  • D. The cost center

Answer: C


NEW QUESTION # 50
What do you have to consider when implementing Ul technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question

  • A. The cloud version can also use SAP GUI for Windows.
  • B. Web Dynpro apps can be used in the SAP Fiori Launchpad.
  • C. SAP Fiori Launchpad supports only SAPUIS apps.
  • D. SAP GUI for HTML can be used in the SAP Fiori Launchpad.

Answer: B,D


NEW QUESTION # 51
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers to this question

  • A. SAP Asset Performance Management
  • B. SAP Service and Asset Manager (formerly SAP Asset Manager)
  • C. SAP Work Manager
  • D. Worker Safety applications

Answer: A,B


NEW QUESTION # 52
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?

  • A. Via the SAP Fiori app "Manage Maintenance Order List"
  • B. Via the SAP Fiori epp "Manage Maintenance Planning Buckets"
  • C. Via the SAP Fiori app "Maintenance Scheduling Board"
  • D. Within the SAP Fion-based background job

Answer: A,C


NEW QUESTION # 53
You want to implement SAPUI5 apps in your SAP Fiori Launchpad. Which are mandatory elements? Note. There are 2 correct answers to this question?

  • A. Web Dynpro Apps
  • B. Tile Groups
  • C. Catalogs
  • D. Transactions

Answer: B,C


NEW QUESTION # 54
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to this question

  • A. Release Print
  • B. Complete Close Report
  • C. Schedule Dispatch
  • D. Release Start Work

Answer: B,D


NEW QUESTION # 55
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.

  • A. Order type
  • B. Maintenance activity type
  • C. Completion data
  • D. Change documents
  • E. Call object

Answer: C,D,E


NEW QUESTION # 56
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question

  • A. Scheduling period
  • B. Counter overflow reading
  • C. Estimated annual performance
  • D. Start counter reading

Answer: C,D


NEW QUESTION # 57
How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process?

  • A. It is mandatory to assign a task list to the maintenance request.
  • B. It contains an additional screening phase where requests can be accepted or rejected.
  • C. It always uses the risk-based assessment for prioritization.
  • D. It is a new business object with no connection to a maintenance notification.

Answer: B


NEW QUESTION # 58
The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question

  • A. For the combination of order type and planner group, you can decide when reservations are created
  • B. Open reservations can be cleared when a maintenance order operation is finally confirmed.
  • C. Reservations are created only after a material availability check has been performed
  • D. All open reservations are closed when the maintenance order is set to TECO.

Answer: B,D


NEW QUESTION # 59
Which SAP UI technology is used for the Report and Repair Malfunction app?

  • A. SAPUI5
  • B. Business Server Pages
  • C. Web Dynpro
  • D. SAP GUI for HTML

Answer: A


NEW QUESTION # 60
......

100% Passing Guarantee - Brilliant C-P2W43-2023 Exam Questions PDF: https://troytec.getvalidtest.com/C-P2W43-2023-brain-dumps.html