
Verified C-P2W43-2023 exam dumps Q&As with Correct 82 Questions and Answers
SAP C-P2W43-2023 Test Engine PDF - All Free Dumps from GetValidTest
NEW QUESTION # 35
Which objects can you assign to a Maintenance Service Order Item? Note: There are 2 correct answers to this question.
- A. Service Master Record
- B. Service Product
- C. Service Work Center
- D. DIP Profile
Answer: B,D
NEW QUESTION # 36
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?
- A. Scheduling type
- B. Package offset
- C. Initial/subsequent buffer
- D. Call horizon
Answer: C
NEW QUESTION # 37
You want to display vehicle-specific data for a piece of equipment. How do you proceed?
- A. Assign a view profile to the combination of equipment category and vehicle class.
- B. Assign a view profile to the combination of vehicle type and equipment category.
- C. Set the relevant flags in Customizing activity "Define Additional Business Views for Equipment Categories".
- D. Assign a view profile to an equipment category for fleet equipment.
Answer: B
NEW QUESTION # 38
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question
- A. Assign an Inspection Type to a Maintenance Order Type.
- B. Create a control key which expects inspection characteristic assignments
- C. Maintain settings at plant level for usage decisions.
- D. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant
Answer: A,C
NEW QUESTION # 39
What do you need to configure to enable entries in the action log of a piece of equipment?
- A. Define the corresponding history related field for the equipment reference category.
- B. Activate the change documents for the equipment category.
- C. Define history related fields in the usage period customizing.
- D. Activate the change documents for the equipment reference category.
Answer: B,C
NEW QUESTION # 40
Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question
- A. Classification data assigned to a technical object
- B. QM inspection plan with assigned inspection characteristics
- C. Master inspection characteristics assigned to PM task list operations
- D. Inspection point type assigned to the task list header
Answer: C,D
NEW QUESTION # 41
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question
- A. Via activity type and hourly rate
- B. Via organizational unit and personal hourly rate
- C. Via cost center assigned to a personnel number
- D. Via cost center and activity type
Answer: A,D
NEW QUESTION # 42
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question
- A. In the report Material: Where-Used List
- B. In the list editing (single-level) for maintenance orders
- C. Within a maintenance order
- D. In the material reservation list in inventory management
Answer: A,C
NEW QUESTION # 43
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
- A. Technical completion date of the maintenance order
- B. The date of the final confirmation
- C. Actual finish date of the maintenance order
- D. Planned date of the next call, independent of maintenance order dates
Answer: A
NEW QUESTION # 44
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time-key date. The orders should be called 3 months before the planned date.How can you set up the maintenance plan? Note: There are 2 correct answers to this question
- A. Set the call horizon to 90 days.
- B. Set the call horizon to 25%.
- C. Set the offset to 3 months
- D. Set the call horizon to 75%
Answer: B,C
NEW QUESTION # 45
How can you assign a material BOM to a piece of equipment?
- A. Via field model number in the equipment master
- B. Via material BOM header in the serialization data
- C. Via creation of an equipment BOM
- D. Via field construction type
Answer: D
NEW QUESTION # 46
What are characteristics of the structure indicator? Note: There are 2 correct answers to this question
- A. It restricts the number of hierarchical levels to no more than 6
- B. It sets the hierarchy levels of the functional location structure.
- C. It defines the allowed characters for a functional location
- D. It limits the types of characters in the edit mask to Alpha and Numeric.
Answer: B,D
NEW QUESTION # 47
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question?
- A. Analyze overdue maintenance orders that have NOT been finally confirmed
- B. Analyze confirmed maintenance orders that have NOT been settled.
- C. Analyze maintenance orders that are still in planning and have NOT been released.
- D. Display approved purchase requisitions for which purchase orders have been generated.
- E. Display approved purchase requisitions for which NO purchase orders have been generated
Answer: A,D,E
NEW QUESTION # 48
You want to create a maintenance order with an external order operation that includes service items.
How can you achieve this? Note: There are 2 correct answers to this question
- A. The assignment of a control key with the service indicator set is mandatory
- B. The usage of a model service specification is mandatory.
- C. The assignment of a control key with key externally processed operation is sufficient.
- D. The actual value entry can be recorded only via the service entry sheet
Answer: A,B
NEW QUESTION # 49
Which default object type do you use to settle a refurbishment order?
- A. The WBS element
- B. The fixed asset
- C. The material
- D. The cost center
Answer: C
NEW QUESTION # 50
What do you have to consider when implementing Ul technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question
- A. The cloud version can also use SAP GUI for Windows.
- B. Web Dynpro apps can be used in the SAP Fiori Launchpad.
- C. SAP Fiori Launchpad supports only SAPUIS apps.
- D. SAP GUI for HTML can be used in the SAP Fiori Launchpad.
Answer: B,D
NEW QUESTION # 51
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers to this question
- A. SAP Asset Performance Management
- B. SAP Service and Asset Manager (formerly SAP Asset Manager)
- C. SAP Work Manager
- D. Worker Safety applications
Answer: A,B
NEW QUESTION # 52
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?
- A. Via the SAP Fiori app "Manage Maintenance Order List"
- B. Via the SAP Fiori epp "Manage Maintenance Planning Buckets"
- C. Via the SAP Fiori app "Maintenance Scheduling Board"
- D. Within the SAP Fion-based background job
Answer: A,C
NEW QUESTION # 53
You want to implement SAPUI5 apps in your SAP Fiori Launchpad. Which are mandatory elements? Note. There are 2 correct answers to this question?
- A. Web Dynpro Apps
- B. Tile Groups
- C. Catalogs
- D. Transactions
Answer: B,C
NEW QUESTION # 54
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to this question
- A. Release Print
- B. Complete Close Report
- C. Schedule Dispatch
- D. Release Start Work
Answer: B,D
NEW QUESTION # 55
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.
- A. Order type
- B. Maintenance activity type
- C. Completion data
- D. Change documents
- E. Call object
Answer: C,D,E
NEW QUESTION # 56
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question
- A. Scheduling period
- B. Counter overflow reading
- C. Estimated annual performance
- D. Start counter reading
Answer: C,D
NEW QUESTION # 57
How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process?
- A. It is mandatory to assign a task list to the maintenance request.
- B. It contains an additional screening phase where requests can be accepted or rejected.
- C. It always uses the risk-based assessment for prioritization.
- D. It is a new business object with no connection to a maintenance notification.
Answer: B
NEW QUESTION # 58
The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question
- A. For the combination of order type and planner group, you can decide when reservations are created
- B. Open reservations can be cleared when a maintenance order operation is finally confirmed.
- C. Reservations are created only after a material availability check has been performed
- D. All open reservations are closed when the maintenance order is set to TECO.
Answer: B,D
NEW QUESTION # 59
Which SAP UI technology is used for the Report and Repair Malfunction app?
- A. SAPUI5
- B. Business Server Pages
- C. Web Dynpro
- D. SAP GUI for HTML
Answer: A
NEW QUESTION # 60
......
100% Passing Guarantee - Brilliant C-P2W43-2023 Exam Questions PDF: https://troytec.getvalidtest.com/C-P2W43-2023-brain-dumps.html